Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13696518
- Product Categories
- Friendly Links
Information Name: | Jindong EPDM laying plastic basketball court |
Published: | 2015-04-11 |
Validity: | 30000 |
Specifications: | 5-8mm |
Quantity: | 9999999.00 |
Price Description: | |
Detailed Product Description: | Shanghai Spring Rui sports facilities Materials Co., Ltd. is a professional manufacturer of artificial turf, rubber track, plastic track, tennis courts, basketball courts, volleyball court, badminton court sports industry is a professional company, including product design and material production, construction of prefabricated indoor multi-purpose sports venues and other construction http://www.liuhonglun123.cpooo.com Shanghai plastic basketball court basketball court basketball court construction program Plastic Profile plastic basketball court basketball court, also known as all-weather sports, the base layer is a rectangular solid plane, polyurethane prepolymer, mixed polyethers, tire rubber, EPDM rubber or PU grain particles, pigments, additives, filler. Plastic basketball court with a good flatness, high compressive strength, hardness, elasticity appropriate, stable physical performance characteristics that will help athletes speed and technology effectively to improve athletic performance and reduce the rate of falls. Plastic basketball court is made of polyurethane rubber and other materials, with a certain degree of flexibility and color, with some UV resistance and anti-aging power is internationally recognized as the best all-weather indoor and outdoor sports venues flooring materials. Prerequisites plastic basketball court laid enough floor space field soil surface should be smooth plastic basketball court venue length specification Olympic basketball tournament and the World Basketball Championship for 28 meters, 15 meters wide, the other games can reduce the length of 4 m, width reduction 2 m, asking them to change in proportion to each other. Measured from the inside of plastic basketball court along the line starting amount. All new plastic basketball court shall comply with the requirements of FIBA: 28 meters long, 15 meters wide. The height of the ceiling or the lowest barrier should be at least seven meters. The long side of the line, said edges, said the end of the short side of the boundary line. Each line on the court have to be very clear, the line width are 0.05 m (5 cm). Said center line from the end of the line stipple a parallel horizontal edges. On both sides of the center line shall be extended by 0.15 meters outside the line (15 cm). To the midpoint of the center line of a circle, with a radius of 1.80 m (radius from the outer edge of the circle from the amount), draw a circle called the circle. Three-point shooting area is restricted by the court two arched out of the ground area. Outside this region was third shot. Drawn from both ends of the free throw line distance between two lines to the end line where the midpoint of each 3 meters (starting from the outer edge of each volume) composed of ground area called restricted area. Its role is to: the ball is in control of this team, limiting the team members in the other restricted area to stay no longer than 3 seconds. Plus the penalty area is restricted area of ??a circle to the midpoint of the free throw line, to 1.80 m radius outside the restricted area to the painting semicircular area, it is the regional implementation of free throws. Plastic basketball court should be smooth, do not have projections and pits, daily to maintain good, drawing a line should be clear. Lighting venue lights should be at least 1500 lux, the brightness is measured from the top of the stadium at one meter. Shall comply with the requirements of television lights. Plastic basketball court process diagram flat cement concrete, asphalt, concrete or marble base layer (dry) → cleaning → primer site mixing ingredients → → → defoaming paving surface adhesive curing → → → mixing ingredients → paving → defoaming → → recycled rubber granules sprinkled roll rubber → → → detection point draw a line measuring line → completed plastic basketball court pavement Process Description First check the flatness of the base layer, for leveling on uneven parts (such as cement concrete foundation needs pickling ). Primer pavement: pavement before first cleaned of foundation primer, ready for construction tools. (1) In accordance with the process required to measure the position of the construction line, put away the construction line. (2) Starting from the venue side of the pavement, according to the width of the space-time scraping gum. (3) even when the squeegee speed, timely show the bottom of the depression, were raised at the glue or gelling. (4) After a glue, for the audience to be checked to ensure that the surface of the rubber pavement thickness. Rubber paving surface: minimize (1) Squeegee intervals every barrel of glue, so that uniform gelation speed. (2) the time to observe the thickness of the plastic surface. (3) shave gel, in front of uncured rubber, sprinkle with plastic particles, wait until after fully cured, the excess rubber surface cleaned. (4) spray, make sure the particles do not fall off. Spray draw process line: According to the current standard of basketball venues and facilities to accurately measure the position of the processing line, and then stencilled with polyurethane paint. |
Admin>>>
You are the 4761 visitor
Copyright © GuangDong ICP No. 10089450, Sports Equipment Co., Ltd. Shanghai Spring Rui All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 4761 visitor
Copyright © GuangDong ICP No. 10089450, Sports Equipment Co., Ltd. Shanghai Spring Rui All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility